IT project database

Weißes Quadrat mit umrandeten Seiten rechts oben

Convince yourself of the range of our IT consulting services and our unique expertise, which we make transparent for you with our IT project database. With the help of filters and keyword searches, you can search through 4622 IT projects that we have successfully completed with our customers.

Update of the existing SAP system landscape SAP ERP 6.07 to the current support package status. First, the development system and test system must be updated. The components to be patched are …
Development of Informatica ETL routes to transform data delivery into a standard format defined for the target system. …
Migration of an existing SAP ERP 6.0 system landscape from Oracle 11.2.04. to SAP HANA 1.0. As part of the migration, we upgraded SAP ERP 6.05 to SAP ERP 6.07 and performed …
Migration of an existing SAP NetWeaver ABAP 7.0 system landscape for SAP ERP 6.0 from Oracle Database to MaxDB. During the migration, SAP NetWeaver 7.0 is upgraded to SAP NetWeaver 7.40 and …
Resumption and implementation of the introduction of an invoicing module in a transport logistics system. The Java-based solution is provided as an invoicing service and replaces the existing C and Cobol programs, …
An existing SAP Solution Manager 7.1 system landscape with ITSM processes (IT Service Management) is updated to version 7.2. The release upgrade is mandatory because support for Release 7.1 has expired. …
Support of the interface to the document management system and support of the release upgrade of the ECMS (Enterprise Content Management System) with regard to the connection to the SAP test system. …
SAP Basis-side support for the implementation of a third-party credit management system. The Web-based system uses an SAP Netweaver installation as a Web application server. Because the ERP system to be connected …
Support for several two-system and three-system landscapes in the area of SAP Basis. In addition to purely maintenance tasks (e.g. importing support packages), test management, system measurement and documentation using the SAP …
Plan and perform release switches from SAP R/3 4.7 to SAP ERP 6.05. This project comprises two two-system landscapes, a sandbox system and two three-system landscapes used by four companies. The release …
A first version of a new transport logistics system is provided on the basis of the previously developed frameworks (web and back end). The focus is on the functions for transport processing, …
Expanding the functionality of the graphical scheduling and telematics in the direct exchange of information with the vehicles. In addition, a geo-component is integrated and its functionality is used. …
The graphical layout of the Transport Logistic Systems Transport Logistic Systems EuroMistral is to be expanded on the base of the practical working experience. …
After the successful introduction of the graphical scheduling for the EuroMistral transport logistics system, additional requirements arising from the practical user experience are implemented. …
A scheduling module is added to the EuroMistral transport logistics system. This scheduling module supports the processing of customer orders and the assignment of the customer orders to transport orders using a …
The graphical "Four-Quadrant Scheduling" developed in Java is introduced at a first pilot customer. This scheduling software is used to schedule the orders recorded in the core module in transport orders. …
A telematics solution was connected to the scheduling in the EuroMistral standard software so that the entire order scheduling and monitoring can be controlled using the graphical user interface of the back-office …
The framework is used for simplified access to a non-standardized Informix database using EJB3, JPA/Hibernate, and AspectJ. The essential classes of the back end are generated using the FreeMarker template engine. …
Creating a web-based front-end framework that allows a dialog system to be efficiently developed. Essential core functions are the general dialog control via a toolbar and menu, uniform user guidance regarding the …
An initial version of a new transport and logistics system is introduced; this system is based on a framework developed previously (web and backend). The main functions are order creation and processing …
Development of a web-based subsystem for creation and dispatching of transfer orders. …
Structuring of requirements including creating and assigning use cases based on a requirements specification which describes the technical changes to the software standard for transport logistics EuroMistral. …
Implementing the invoicing in the EuroMistral transport logistics system as a JAVA-based solution while taking into account the previous data structures. This solution should replace the existing C and Cobol programs. …
For an internation trading company the debtors interface in Finland is redesigned.The customers may buy with account cards in the stores. The customer sales are gathered. If a certain amount is exceeded …

Have we sparked your interest?

Dr. Frank Gredel, ein Mann mit braunen Haaren

Dr. Frank Gredel

Head of Business Development

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.