SAP R/3 release upgrade from 4.0B to 4.6C

Project duration: 8 months

Brief description

A release upgrade from SAP R/3 4.0B to SAP R/3 4.6C is carried out in a large enterprise.

Supplement

The release upgrade is supported systematically from the start. Starting with the PUT on 4.6C, to analyzing the error logs that occur, through to processing SPDD and SPAU.

Overview

Project period01.07.2002 - 28.02.2003