This is one of 4622 IT projects that we have successfully completed with our customers.

How can we support you?

Weißes Quadrat mit umrandeten Seiten rechts oben

SAP BW (QM): raw manufacturing scrap from production

Project duration: 1 month

Brief description

Analysis of raw production errors identified during processing.

Supplement

Structuring a MultiProvider made of BasisCubes from the area of period-specific order/material view, series production incoming goods, period-specific transaction/workstation view and message items.

Subject description

The aim is to optimize the raw production process. Raw production faults (the specific case involves a piston foundry) are generally found in manufacturing. There is a precise differentiation according to fault location, fault cause and fault type. The individual faults can be traced back in the evaluation to a specific raw production shift. Noticeably high error rates for specific products are an indication that the manufacturing process needs to be improved.

Overview

Project period17.05.2004 - 18.06.2004

Have we sparked your interest?

Portrait Herr Knudsen, Mann im Anzug

Ole Knudsen

Key Account Manager

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.