Redesigning the material control system

Project duration: 8 months

Brief description

Redesigning the functions and user interface of an application developed previously for controlling materials management in logistical handling in the field of power plant engineering. During the course of further development, a migration is carried out from SQL*Forms 3.0 to Oracle Forms 4.5.

Overview

Project period01.01.1997 - 31.08.1997