Bill of material processing/ production control center
Project duration: 1 year, 5 months
Brief description
Creating and maintaining interfaces between the bills of material system and the production control center.
Supplement
The bills of material data for components planned in the production control center is transferred from the BOM system in batch runs to the production control center. Data about the degree of production is returned from the production control center to the bills of material and factory delivery system.