Adaptations and further development of a raw material system
Project duration: 2 years, 11 months
Brief description
The raw material system of a food manufacturer is continuously adapted and expanded. These implementations take place both across the board and separately for several subsidiaries. The technological basis is Web Dynpro for Java, Hibernate/JDBC/SQL and other Java libraries and frameworks.
Supplement
In detail, the following requirements will be implemented: Enhancements to the display and processing of master data; Oracle-based geodata display and processing; enhancements and corrections in the area of tabular plan data display and processing incl. drilldown functions; expansion of coverage planning and creation of a flexible main contract and account posting control for the French subsidiary; adjustments in the area of average and total delivery data display incl. Oracle-based calculation.
Subject description
Furthermore, extensions in the area of mass account data change and display regarding due date as well as process request generation in connection with parameter templates, PDF uploads and XML output are implemented. For the Belgian subsidiary, a transfer including copy generation of business data objects in subsequent years as well as their dependencies will be implemented. In addition, adjustments/corrections of the framework used are made, e.g. with regard to table display and navigation.