This is one of 3224 IT projects that we have successfully completed with our customers.

How can we support you?

Weißes Quadrat mit umrandeten Seiten rechts oben

Enhancement of an Active Position Manager impl

Project duration: 9 months

Brief description

The object of the project is the current implementation of the Active Position Manager (APM), a subsystem of OpenLinks industry solution Endur, which is used for the evaluation and control of positions and position movements. The purpose of the project is to clean up the existing APM installation with the aim of increasing stability and performance, but also to extend the current configuration to address new requirements.

Supplement

The required data in the front end cannot be read from the existing data structure from ADSs without considerable effort and performance load. New metadata is implemented in APM to improve the performance of ADS and allow better use of the data provided. The new metadata can be used to restructure existing pages, which then enable a 90% reduction of open ADS queries in the system. New functionalities can also be implemented, which enable a considerable reduction of manual processes in the front office.

Overview

Project period01.07.2017 - 31.03.2018

Have we sparked your interest?

Dr. Andreas Schneider, grauhaariger Mann mit Brille

Dr. Andreas Schneider

Head of Energy

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.