This is one of 4124 IT projects that we have successfully completed with our customers.

How can we support you?

Weißes Quadrat mit umrandeten Seiten rechts oben

Restructuring of Endur end-of-day

Project duration: 7 months

Brief description

Restructuring and accelerating end-of-day processing (EOD) in the Endur standard software.

Supplement

With the consolidation of the customer system landscape with the Endur standard software as a central component, there is a requirement to migrate all long-term delivery contracts from other systems (see project 3315). The associated increase in data can be expected to significantly slow down end-of-day processing (EOD), which can prevent business-critical reports from being created on time. Therefore, the current EOD is restructured with the objective speeding up processing. Measures include – replacing CSV exports with direct access to the destination systems in user tables in the Endur schema – Deleting reports that are no longer required from the database – Changes to the processing sequence – Parallelization – Grid use

Overview

Project period16.05.2013 - 19.12.2013

Have we sparked your interest?

Dr. Andreas Schneider, grauhaariger Mann mit Brille

Dr. Andreas Schneider

Sector Manager Energy

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.