To use the newly installed APM (Active Position Manager) 2.18.1 to its full extend, the following tasks are executed: Optimization of the data services, redesign of the APM pages, reconcilitation tests, go-live support.
Supplement
Optimization of the data services: To optimize the data volume of the services are redesigned. The volume could be decreased by 69 %. Redesign of the APM pages: The pages get adjusted to the new services design. On MWh/MW pages the APM delta package gets replaced by the APM power package. The EFA calendar pages get adjusted to the pivot layout. Reconcilitation test: All pages are reconciled with a reference system. Go-Live: Supporting the IT department with the implementation in the production system. Hyper care phase on the trading floor to assist the users with questions and problems.