This is one of 4620 IT projects that we have successfully completed with our customers.

How can we support you?

Weißes Quadrat mit umrandeten Seiten rechts oben

SAP Retail: changeover to single-stage relocation method

Project duration: 6 months

Brief description

In order to relocate logistical distribution centers in branches to SAP Retail, a two-stage relocation was implemented in the introduction project. This solution is to be replaced by changing over to a single stage method, thereby optimizing the business process.

Supplement

The previous method of two-stage relocation is designed so that stock removals from the logistical distribution center are first posted to stock in transit. Only once the goods are physically received in the branch is the movement into stock posted and then moved out of the stock in transit. Postponements can result in negative stocks, which have to be cleared by means of postings via a pseudo storage location.

Subject description

The new solution should avoid the stock in transit because this and the pseudo storage location have to be monitored and cleaned up. In single-stage stock transfer, the goods issue from the logistical distribution center is used to post a goods receipt in the branch enterprise resource planning systems by means of ALE/IDoc. This also results in a series of other change requests regarding the business processes and the stock valuations.

Overview

Project period01.11.2008 - 30.04.2009

Have we sparked your interest?

Marcus Rödiger, ein Mann mit braunen Haaren und Brille

Marcus Rödiger

Head of Consumer Goods & Retail

Jetzt Kontakt aufnehmen

Zum Umgang mit den hier erhobenen Daten informieren wir in unserer Datenschutzerklärung.

Contact now

We provide information on the handling of the data collected here in our privacy policy.

Download file

We provide information on the handling of the data collected here in our privacy policy.